A PARTNER FOR YOUR INDUSTRIAL NEEDSCIKARANG, INDONESIA   ·   EST. 2000

PT CIKARANG MITRA SERVICES

Expertise that
keeps industry
moving forward.

From machinery maintenance to turbine installation. PT Cikarang Mitra Services supports your industrial needs, since 2000.

2000SERVING SINCE · CIKARANG, INDONESIA
EXPERTISE IN THE FIELDPeople. Precision. Dedication.01 /
2000Established
Industrial
Services
Maintenance & installation
CikarangBased in Cikarang
Team posing at an industrial facility
SERVING SINCE2000

01 / ABOUT CMS

Experience built.
Trust earned.

Building on industrial experience dating back to 1989, PT Cikarang Mitra Services was established in 2000 and continues to serve industrial needs. We combine field services with workshop capabilities to help customers deliver their technical work.

Our approach begins with understanding the job, then aligning technical expertise, equipment, and the scope of work.

Discover our capabilities

Field expertise, manufacturing support.

Mechanical and electrical teams support work at industrial sites, with attention to technical requirements and personnel safety. Workshop capabilities complement these services through the design and manufacture of equipment to customer requirements.

Mechanical & electricalInstallation & maintenanceEngineering & manufacturing
PT Cikarang Mitra Services · Cikarang, Indonesia

02 / OUR SERVICES

Technical support.
From installation to maintenance.

Services for machinery, electrical systems, and industrial equipment—matched to the needs of your operation.

Technician working on a turbine shaft
01 / CMS

Industrial maintenance

Maintenance for mechanical rotating equipment, electrical systems, and instrumentation.

Service scope
  • Routine inspections
  • Repairs and component replacement
  • Rotating equipment, electrical systems, and instrumentation
Discuss this service
Team working inside an open turbine casing
02 / CMS

Turbine installation

Gas and steam turbine installation for industrial facilities.

Service scope
  • Gas and steam turbines
  • Installation alignment and testing
Discuss this service
Large industrial equipment on a trailer
03 / CMS

Machinery relocation

Dismantling and reinstallation of engines and power generators.

Service scope
  • Engine and generator dismantling
  • Reinstallation at the destination site
Discuss this service

Further capabilities for your operation.

04 / CMS

Switch yards

Switch yard installation and maintenance for power distribution needs.

Discuss this service
06 / CMS

Engineering & manufacturing

Design and manufacture of special purpose machines, dies, molds, fixtures, mixers, and conveyors.

Discuss this service
Close view of turbine blades and shaft from the company archive

BEHIND EVERY DETAIL

Industrial scale.
Human precision.

From turbine components to installations in the field, our people bring their expertise to every job.

Explore our experience
MechanicalElectricalManufacturing

03 / OUR WORK IN FOCUS

Behind every machine,
human expertise.

A closer look at the people, equipment, and working environments in our company archive.

SELECTED EXPERIENCE

A record of work.
Across industrial needs.

Selected experience documented in the company profile, from turbine inspections to installation work.

2001–2015

PT Paiton Energy

Units 7–8 · Steam turbine and bearing inspections, and generator rewinding.

2005–2015

PT Fajar Surya Wisesa

GT 1–2 · Installation, combustion inspection, HGPI, and major inspection.

2010

PLN — Belawan

Gas turbine installation.

2011

PLN — Pontianak

Gas turbine combustion inspection.

Experience across disciplines

Building on industrial experience since 1989, CMS was established in 2000 and continued serving industrial needs. Explore this record of experience by discipline.

Turbines20 entries

PT Paiton Energy

Steam turbines, units 7–8; inspections, generator rewinding, bearings, boiler feed pump turbines and valves.

2001–2015

PT Cikarang Listrindo

Gas turbine inspections, units 1–6; turbine installation, units 7–8.

1995; 1999–2003; 2006; 2009; 2012–2015

Tangguh LNG

Gas turbine major overhaul; combustion inspection; TAR 3–4–5–6.

2011–2015

PT Asrigita Prasarana Power Plant — Palembang

Installation, combustion inspection, HGPI and major overhaul.

2003–2015

PT PLN Padang

2 × 30 MW gas turbine generators; relocation to PLN Jambi and inspections.

1997–2014

PT Arun NGL Co.

Trains 1–6; Frame 5 double-shaft gas turbines; inspections.

1989–2012

PT Badak LNG Co.

Trains A–F; steam turbine compressors; major overhaul.

1989–2012

Pertamina UP Plaju

Unit B hot gas path inspection; unit A major inspection and installation.

2001–2012

Chevron Pacific Indonesia

Gunung Salak geothermal unit.

2015

PT Geodipa Energy

Toshiba 55 MW power plant.

2015

PT Fajar Surya Wisesa (Fajar Paper)

GT 1–2; installation, combustion inspection, HGPI and major inspection.

2005–2015

Petrochina — Jambi

Hitachi gas turbine.

2012–2015

Lontar Papirus — Jambi

Gas turbine.

2013

PLN — Pontianak

Gas turbine combustion inspection.

2011

PLN — Belawan

Gas turbine installation.

2010

PT Surya Kertas — Surabaya

Gas turbine generator hot gas path inspection.

2007

PT Chandra Asri Petrochemical Center

Gas turbine generator combustion inspection.

2003; 2006

PT PLN — Tambak Lorok Semarang

Gas and steam turbine inspections; partial winding.

2002

PT PLN — Tanjung Priok

Frame 7B gas turbine dismantling and relocation to CPI Duri; modification from 50 Hz to 60 Hz.

1998–1999

CNOOC — Pabelokan Island

Frame 5 single-shaft gas turbine generator; major inspection.

2003; 2010
Mechanical & electrical3 entries

PT Cikarang Listrindo

Cooling tower fan gearbox repair; fogging system.

2002

PT PLN — Tambak Lorok Semarang

Instrument checks and air inlet valve system rechecks.

2002

PT PLN Samarinda

Water treatment and cooling water pump installation.

2001
Compressors1 entry

PT Badak LNG Co.

Dresser Rand; trains A–F; overhaul and major inspection.

2009
Workshop7 entries

Riau Andalan Pulp and Paper — Pangkalan Kerinci

Pump reconditioning; pulp dryer area.

2010–2012

Riau Andalan Pulp and Paper — Pangkalan Kerinci

Ball valve reconditioning.

2010–2012

Riau Andalan Kertas — PM1, Pangkalan Kerinci

Gearbox reconditioning.

2010–2012

Indah Kiat Pulp and Paper — Perawang

Screw coating reconditioning; Air Division.

2010–2014

Indah Kiat Pulp and Paper — PPM1

Vacuum pump reconditioning.

2012

Indah Kiat Pulp and Paper — PPM 4

Rotary joint reconditioning.

2013–2014

Indah Kiat Pulp and Paper — Perawang

ID Fan & Bus Bar Electric RAK

2010–2014

Documentation from the field

People, components, and working environments from the company photo archive.

04 / OUR FACILITIES

Expertise in the field.
Support from the workshop.

Our Cikarang workshop supports manufacturing to customer requirements, from design to the production of components and equipment.

Machining facilities and technical personnel support products including dies, molds, fixtures, mixers, conveyors, and special purpose machines.

Discuss your needs
600 m²

Workshop area · Cikarang

01CNC & machining
02Welding & cutting
03Manufacturing to your requirements
Close view of a turbine rotor

LET’S TALK

Your industrial needs.
Our next conversation.

Talk to our team about your maintenance, installation, or manufacturing requirements.

Head office

Jalan Jababeka Raya Blok B.23,
Ruko Kawasan Industri Jababeka
(021) 89830323–24

Workshop

Jalan Samsung 2C Blok C.21,
Segitiga Emas Jababeka (UKM Center), Cikarang
(021) 29094221–24